Draft 2024 Integrated System Plan and Draft 2023-24 GenCost Report
Independent Engineers, Scientists and Professionals question draft reports on Electric Power
From a contributor
Electric power is the lifeblood of modern society and our way of life as a first world nation depends entirely on affordable and reliable power.
The political imperative to reduce emissions calls for radical reform of the power system and this demands planning at the peak of professionalism and competence.
We turn to the CSIRO and AEMO who have the major responsibility and they have recently released draft reports.
Here is a review of those reports, carried out by a team of independent engineers, scientists and other professionals.
Click image for link 👇
Conclusions and Recommendations
Submission to AEMO/CSIRO on the Draft 2024 ISP and GenCost
By Independent Engineers, Scientists & Professionals
This assessment finds the draft 2024 ISP for the future NEM fails to meet any of the national goals for reliability, low cost and zero emissions.
The ISP also does not meet consumer interests and is negligent regards detail, creates substantial risks to the environment, requires consumers to support the grid with solar PV and batteries, imposes intrusive controls on home generation, storage and usage of electricity, and poses significant risks to national security.